Industries · Security & critical infrastructure

Security & critical infrastructure

Written for
The CISO office, the crypto-agility programme, resilience and continuity planning.
The decision
Which cipher to migrate first and by when; which assets fail together under attack.
How it is done today
Inventories exist; dates do not; resilience is scored asset by asset.
When it goes wrong A migration without a date is a budget without a year; a blast radius scored one asset at a time misses what fails together.

Applications

ApplicationYou giveYou getStatus
Post-quantum migration planning
Proof Central window 2030–31, range 2028–34 · Read the case
Your cipher inventoryA dated window per cipher and the migration orderAssessment
Correlated-failure and blast-radius analysisThe dependency graphWhat fails together across the estateMapped
QKD network designThe fibre map and the sitesWhere the QKD nodes goDeployed through the platform network
Network-traffic anomaly detectionTraffic recordsThe anomalous flowsDeployed through the platform network
Water and utility anomaly detectionSensor recordsThe anomaliesDeployed through the platform network
Key-size assuranceYour lattice parametersWhat they rest onAssessment
What changes for you
  • A dated window per cipher to budget against.
  • What fails together is read across the whole estate rather than scored one asset at a time.
First engagement
You send Your cipher inventory.
You get back The dated order. Two weeks.

Proof · Post-quantum migration planning

Readiness assessment
2030–31
central estimate of the risk window per cipher, range 2028–34: a dated window to budget the migration against
Baseline Published resource estimates and error-rate requirements
Platform Our dated assessment, not a measurement
Decision
Which cipher to migrate first, and by when
What is modelled
Per-cipher break timelines from published resource estimates, and the dependency graph of the assets that rely on each cipher.
Operational outcome
  • A dated risk window per cipher
  • A migration order across the estate
  • A budget timeline the board can plan against

Problem size Every cipher in the estate · the asset dependency graph · Scope A planning assessment; it informs the migration and does not perform it.

Benchmark

Published reference Lattice attacks on hardware run at dimension 7 against classical sieving beyond 180; the 2024 polynomial-time claim was withdrawn by its author. arXiv:2006.14057; arXiv:2604.27153
Merlin A dated window per cipher, central 2030–31
Baseline Published resource estimates

Further results in this industry

Case studies

Security · post-quantumAssessment
A dated risk window for each cipher in your estate, so the post-quantum migration is planned and budgeted rather than rushed.

Other industries

Semiconductors & advanced materials · Energy & utilities · Chemicals & process manufacturing · Mobility & automotive · Telecom · Pharma & life sciences · Finance · Aerospace & sovereign programmes