Industries · Security & critical infrastructure
Security & critical infrastructure
Written for
The CISO office, the crypto-agility programme, resilience and continuity planning.
The decision
Which cipher to migrate first and by when; which assets fail together under attack.
How it is done today
Inventories exist; dates do not; resilience is scored asset by asset.
When it goes wrong A migration without a date is a budget without a year; a blast radius scored one asset at a time misses what fails together.
Applications
| Application | You give | You get | Status |
|---|---|---|---|
| Post-quantum migration planning Proof Central window 2030–31, range 2028–34 · Read the case | Your cipher inventory | A dated window per cipher and the migration order | Assessment |
| Correlated-failure and blast-radius analysis | The dependency graph | What fails together across the estate | Mapped |
| QKD network design | The fibre map and the sites | Where the QKD nodes go | Deployed through the platform network |
| Network-traffic anomaly detection | Traffic records | The anomalous flows | Deployed through the platform network |
| Water and utility anomaly detection | Sensor records | The anomalies | Deployed through the platform network |
| Key-size assurance | Your lattice parameters | What they rest on | Assessment |
What changes for you
- A dated window per cipher to budget against.
- What fails together is read across the whole estate rather than scored one asset at a time.
First engagement
You send Your cipher inventory.
You get back The dated order. Two weeks.
Proof · Post-quantum migration planning
Readiness assessment
2030–31
central estimate of the risk window per cipher, range 2028–34: a dated window to budget the migration against
Baseline Published resource estimates and error-rate requirements
Platform Our dated assessment, not a measurement
Decision
Which cipher to migrate first, and by when
What is modelled
Per-cipher break timelines from published resource estimates, and the dependency graph of the assets that rely on each cipher.
Operational outcome
- A dated risk window per cipher
- A migration order across the estate
- A budget timeline the board can plan against
Problem size Every cipher in the estate · the asset dependency graph · Scope A planning assessment; it informs the migration and does not perform it.
Benchmark
Published reference Lattice attacks on hardware run at dimension 7 against classical sieving beyond 180; the 2024 polynomial-time claim was withdrawn by its author. arXiv:2006.14057; arXiv:2604.27153
Merlin A dated window per cipher, central 2030–31
Baseline Published resource estimates
Further results in this industry
- Which assets fail together under attack is simulated on the dependency graph; published search-based methods degrade from 0.983 at 10 qubits to 0.039 at 30.
Case studies
Security · post-quantumAssessment
A dated risk window for each cipher in your estate, so the post-quantum migration is planned and budgeted rather than rushed.
Other industries
Semiconductors & advanced materials · Energy & utilities · Chemicals & process manufacturing · Mobility & automotive · Telecom · Pharma & life sciences · Finance · Aerospace & sovereign programmes