Industries · Chemicals & process manufacturing

Chemicals & process manufacturing

Written for
Plant scheduling, supply-chain planning and formulation R&D at a specialty or bulk chemicals maker.
The decision
Which production plan to run this shift; which formulation to make next.
How it is done today
Scheduling in spreadsheets or a legacy APS that takes hours to re-plan, so the plant runs yesterday’s plan.
When it goes wrong Every hour of re-planning is an hour of changeovers and due dates decided on stale data.

Applications

ApplicationYou giveYou getStatus
Production scheduling across grades and changeovers
Proof 6 h → 1 min, across 100+ product grades, in daily use
Grades, due dates and capacityA checked plan in minutesDeployed through the platform network
Nesting and job-shop scheduling (sheet, batch, multi-machine)Jobs, machines and sequencesThe sequence and the nestingDeployed through the platform network
Formulation and additive candidate ranking
Proof Four of four formulations ranked correctly on IBM Heron, materials lane
Candidate moleculesA ranked list with the gapsLive on quantum hardware
Catalyst and process-chemistry screeningCandidate catalysts or intermediatesA ranking with binding and activation energiesReady · computed, hardware next
Revenue management and order acceptanceOrders, margins and capacityWhich orders to acceptDeployed through the platform network
Predictive maintenance on cable and rotating assets
Proof Early warning on cable breaks moved from 2 days to 5–7 days
Sensor historyEarlier warningDeployed through the platform network
What changes for you
  • Re-plan on demand instead of once a shift.
  • Formulations ranked before the pilot plant.
  • A straight answer when your current solver already wins.
First engagement
You send One week of plant data: grades, orders, changeovers, capacity.
You get back The re-plan and the comparison with your current plan. Two weeks.

Proof · Production scheduling

Customer deployment · platform network
6 h → 1 min
production schedule across 100+ product grades, recalculated in 1–10 minutes instead of 2–6 hours, in daily use
Baseline The plant’s prior manual and spreadsheet planning
Platform Classical optimisation solvers, delivered through our platform network
Decision
Which production plan to run this shift
What is modelled
100+ product grades with changeovers, due dates and capacity, as a constrained scheduling model.
Operational outcome
  • Re-planning on demand when conditions change
  • Verification included in the run time
  • In daily production use

Problem size 100+ grades · one plant · minutes per re-plan · Scope A classical optimisation deployment; quantum hardware was not used.

Benchmark

Published reference No published production-scheduling result on quantum hardware at industrial scale; visible results are challenge prototypes. arXiv:2411.10303
Merlin 6 h → 1 min across 100+ grades, in production
Baseline The plant’s prior manual planning

Further results in this industry

Case studies

Semiconductors · materialsQuantum hardware · Simulation
Resist candidates ranked before any were made, so only the lead goes to synthesis and wafer testing. Award winner, 2nd place worldwide, GIC 2026 Advanced Materials track (Mitsubishi Chemical Group × AIST).

Platform network results

Results delivered through Merlin’s platform network, with the client anonymised to its sector and the figure quoted with its published conditions. These are not Merlin hardware runs.

Chemicals & process manufacturingPlatform network
Production scheduling in minutes, not hours
2–6 h → 1–10 min
A Japanese chemicals manufacturer rebuilt its production schedule in two to six hours — too slow to react to a change within the same shift.
Production scheduling cut from 2–6 hours to 1–10 minutes, using classical optimisation.
Delivered through Merlin’s platform network · classical optimisation

Other industries

Semiconductors & advanced materials · Energy & utilities · Mobility & automotive · Telecom · Pharma & life sciences · Finance · Security & critical infrastructure · Aerospace & sovereign programmes