Industries · Energy & utilities

Energy & utilities

Written for
Transmission and distribution planning, system operations and asset management at a TSO, DSO or utility.
The decision
Which reinforcement to commit capital to, which units to commit, how the network behaves when a line trips.
How it is done today
MILP and heuristic planning tools, with contingency analysis run case by case.
When it goes wrong A plan that is not shown optimal is hard to defend to a regulator; a missed contingency is an outage.

Applications

ApplicationYou giveYou getStatus
Transmission expansion planning
Proof Optimum proven over 1,048,576 plans; a reduced-order encoding came out 9% worse on the same photonic QPU · Read the case
A MATPOWER-style network and the candidate linesThe plan, optimum proven, with the full-model vs reduced-model gapLive on quantum hardware
Contingency and cascading-failure analysis
Proof Network response simulated to 8 time steps on 156 qubits; the classical simulator we ran stopped at 6 · Read the case
The networkWhich assets fail together and where the response concentratesLive on quantum hardware
Unit commitment and economic dispatch
Proof Unit commitment at 25,755 variables and 48,939 constraints ran feasibly on a photonic QPU · Read the case
Generators, periods and constraintsA feasible dispatch, benchmarked against your MILPDeployed through the platform network
Distribution-grid reconfiguration
Proof 69-bus feeder reconfiguration through the platform network · Read the case
The feeder networkA switching planDeployed through the platform network
Renewable integration and storage sitingThe network and the candidate sitesSites ranked under contingencyMapped
Battery, catalyst and capture chemistryCandidate materialsA ranking with the smallest difference it resolvesReady · computed, hardware next
What changes for you
  • The plan is checked against every alternative, not sampled.
  • The cost of the simplified model your tool uses is measured, not assumed.
  • The network’s real response is simulated past where the classical reference stops.
  • These findings do not establish a commercial quantum benefit.
First engagement
You send One expansion case, as a network file with in-service status honoured.
You get back The proven plan and the gap. Two weeks.

Proof · Transmission expansion planning

Research result
1,048,576 plans · optimum proven
the chosen expansion plan proven optimal over every one of 2^20 candidate build plans
Baseline Exhaustive classical search over all plans
Platform CPU search; network response on a 156-qubit processor and a photonic QPU
Decision
Which network reinforcement plan to commit capital to
What is modelled
20 candidate reinforcements, so 2^20 build plans, each with the network loading it produces.
Operational outcome
  • A proven-optimal plan, not a sampled one
  • The cost of a reduced-order model quantified: 9% worse on the same QPU
  • Network response simulated to 8 time steps on 156 qubits

Problem size 20 binary investment decisions · 1,048,576 plans · 156-qubit network response · Scope These findings do not establish a commercial quantum benefit.

Benchmark

Published reference Unit commitment at 25,755 variables and 48,939 constraints ran feasibly on a photonic QPU, with a commercial MILP solver ahead at short runtimes; generation scheduling at 26 generators × 24 periods on 36 trapped-ion qubits, no optimality proof. arXiv:2505.00145; platform-network results, 2025–26
Merlin Optimum proven over 1,048,576 plans · reduced-order model 9% worse on the same QPU
Baseline Exhaustive classical search; the full model on the same machine

Further results in this industry

Case studies

Energy · networksSimulation · Quantum hardware
A network-expansion plan proven optimal over every one of more than a million alternatives, plus the network’s real-time response simulated on quantum hardware.
Energy · utilitiesQuantum hardware
The response of a 156-node network simulated to eight time steps on a 156-qubit processor; the classical simulator we ran stopped at six. For a planner, that is the contingency case read further than the reference tool reaches.
Energy · utilitiesPlatform network · Quantum hardware
A unit-commitment problem of 25,755 variables and 48,939 constraints solved feasibly with a photonic quantum processor inside a hybrid MILP decomposition, on a national-laboratory testbed. The commercial MILP solver was better at short runtimes; the hybrid was competitive at longer ones. These findings do not establish a commercial quantum benefit.
Energy · utilitiesPlatform network · Quantum hardware
Switch reconfiguration on a 69-bus distribution network run on a superconducting quantum processor through our platform network. The optimum was found more than seven times as often as with the unoptimised quantum workflow; the baseline is a quantum workflow, not a classical solver. The scale at which this would beat classical methods, about 230 buses, is a projection and has not been shown.